Tomato processing plant feasibility study — from capacity to committed scenario

A feasibility study is what turns an idea into a decision. MCF Technology delivers it before any equipment commitment: mass balance on real inbound °Brix, utilities and staffing, CAPEX schedule, operating cost, cash flow and a bankability assessment. If the numbers do not hold, the study says so — that is its purpose.

What MCF Technology supplies

  • Raw material assessment: varieties, inbound °Brix, campaign window, logistics
  • Mass and energy balance for the selected capacity
  • Utilities sizing: steam, electricity, water, effluent
  • CAPEX schedule and phasing options
  • Operating cost model: energy, labour, packaging, maintenance
  • Cash flow, EBITDA, payback, DSCR and sensitivity analysis

Typical outputs

  • Committed technical scenario
  • CAPEX and OPEX model
  • Cash flow with DSCR
  • Bankability assessment (A–D grade)

Download — PDF

tomato processing plant feasibility study — technical datasheet

A real engineering datasheet, not a brochure: the same data published on this page, formatted for your technical and financial review.

  • Technical data & process

    Reference configuration, specifications, step-by-step process

  • Dimensions & layout

    Footprint, clear height, functional zones, utilities and manning

  • CAPEX & payback

    Indicative capacity / CAPEX / EBITDA / payback grid with assumptions

MCF Project Studio

From idea to commissioned plant, in one engineering path

Every commercial page on this site is connected to the same working method: process engineering, capacity sizing, CAPEX and a bankable financial plan over 3–10 years are produced together, not in sequence by different suppliers.

  1. 01 · Idea

    Is this factory feasible in my country, with my product and my formats?

    Start from the guided configurator
  2. 02 · Engineering

    Which capacity, process and utilities does my line actually need?

    Compare technologies and lines
  3. 03 · Investment

    What does it cost, what does it return, and is it bankable?

    Run the ROI simulator
  4. 04 · Purchase

    Who engineers, installs and services it worldwide?

    Request the technical-financial dossier

Capacity → CAPEX → payback

What the feasibility study fixes

The feasibility study converts the screening ranges below into one committed scenario, with mass balance, utilities, staffing and a bankable cash-flow model.

Indicative capacity, CAPEX, annual output, EBITDA, payback and commissioning time
CapacityTurnkey CAPEXAnnual outputEBITDAPaybackCommissioning
30 t/h fresh tomato€4.5 – 6.5 million9 000 – 12 000 t/year of 30 °Brix paste18 – 24% of revenue4.5 – 6 years12 – 15 months contract-to-commissioning
60 t/h fresh tomato€8 – 11 million19 000 – 24 000 t/year of 30 °Brix paste20 – 26% of revenue4 – 5.5 years14 – 18 months contract-to-commissioning
120 t/h fresh tomato€14 – 19 million38 000 – 48 000 t/year of 30 °Brix paste22 – 28% of revenue3.5 – 5 years16 – 20 months contract-to-commissioning

Assumptions behind the figures

  • Campaign of 90–110 days per year, 20–22 productive hours per day.
  • Hot break line, evaporation to 28–30 °Brix, aseptic filling in 220 L bag-in-drum or 1 000 L IBC.
  • Yield 5.5–6.5 t of fresh tomato per tonne of 30 °Brix paste, depending on inbound °Brix.
  • CAPEX is turnkey scope: process equipment, automation, installation, commissioning and training; civil works and land excluded.
  • EBITDA and payback assume export bulk paste pricing and no financing cost inside the operating margin.

From range to committed scenario

Indicative engineering ranges used by MCF Technology for budget screening. Final CAPEX, EBITDA and payback are fixed only in the feasibility study, once inbound °Brix, campaign length, utilities cost and target packaging are confirmed.

Related processes

A complete tomato processing plant feasibility study project typically integrates pasteurization, sterilization, homogenization and aseptic filling. Follow the internal links below to deep-dive into each upstream and downstream stage engineered by MCF Technology.

Technical FAQ

Frequently asked questions

What does the feasibility study contain?

Raw material assessment, mass and energy balance, plant layout concept, utilities sizing, CAPEX schedule, operating cost model, cash flow with EBITDA, payback and DSCR, plus a sensitivity analysis on °Brix, energy tariff and paste price.

Do I need it if I already have quotations?

Quotations price a scope; a feasibility study verifies that the scope produces a profitable, financeable plant. Without it, the mass balance, utilities and cash flow behind the quotation are unverified assumptions.

Which inputs must the client provide?

Available raw material and expected inbound °Brix, target product and packaging, site location with utility tariffs and, where known, the intended debt structure. Everything else is engineered by MCF.

How long does the study take?

Typically 3–6 weeks depending on how much raw-material and site data is already available.

Is the study reusable with a bank?

Yes — it is written to be submitted. The financial section carries the DSCR profile, break-even revenue and a bankability grade with the underlying risk matrix and document checklist.

What happens if the study is negative?

MCF reports it and proposes the corrective levers: different capacity, phased CAPEX, different packaging mix or a different campaign strategy. A rejected scenario before the order is far cheaper than a plant that cannot service its debt.

Next step

Request a feasibility study for your tomato processing plant feasibility study

MCF Technology delivers worldwide — engineering, installation, commissioning and after-sales service on every continent. Send us your throughput target and destination country and we will reply with a preliminary sizing and quote.