120 t/h tomato processing plant — large-scale campaign line

Above 100 t/h the tomato plant becomes an energy project as much as a food project: evaporation choice, vapour recovery and water reuse decide the cost per tonne far more than the equipment list. MCF Technology engineers 120 t/h campaign lines with forced-circulation or MVR evaporation and redundant aseptic filling.

What MCF Technology supplies

  • Reception with multiple unloading bays, flumes and water recovery: 120 t/h
  • Hot break with high-capacity extraction and refining trains
  • Forced-circulation triple / quadruple effect or MVR evaporation
  • Three or more aseptic filling heads with redundancy
  • Water reuse, condensate recovery and energy optimisation
  • Full plant SCADA with MES-ready traceability

Typical outputs

  • 30 °Brix and 36–38 °Brix paste for bulk export
  • High-volume passata
  • Diced and crushed tomato lines

Download — PDF

120 t/h tomato processing plant — technical datasheet

A real engineering datasheet, not a brochure: the same data published on this page, formatted for your technical and financial review.

  • Technical data & process

    Reference configuration, specifications, step-by-step process

  • Dimensions & layout

    Footprint, clear height, functional zones, utilities and manning

  • CAPEX & payback

    Indicative capacity / CAPEX / EBITDA / payback grid with assumptions

MCF Project Studio

From idea to commissioned plant, in one engineering path

Every commercial page on this site is connected to the same working method: process engineering, capacity sizing, CAPEX and a bankable financial plan over 3–10 years are produced together, not in sequence by different suppliers.

  1. 01 · Idea

    Is this factory feasible in my country, with my product and my formats?

    Start from the guided configurator
  2. 02 · Engineering

    Which capacity, process and utilities does my line actually need?

    Compare technologies and lines
  3. 03 · Investment

    What does it cost, what does it return, and is it bankable?

    Run the ROI simulator
  4. 04 · Purchase

    Who engineers, installs and services it worldwide?

    Request the technical-financial dossier

Capacity → CAPEX → payback

120 t/h tomato line — investment profile

Large-scale campaign plant with forced-circulation or MVR evaporation, where energy per tonne becomes the dominant cost driver.

Indicative capacity, CAPEX, annual output, EBITDA, payback and commissioning time
CapacityTurnkey CAPEXAnnual outputEBITDAPaybackCommissioning
120 t/h fresh tomato€14 – 19 million38 000 – 48 000 t/year of 30 °Brix paste22 – 28% of revenue3.5 – 5 years16 – 20 months contract-to-commissioning

Assumptions behind the figures

  • Campaign of 90–110 days per year, 20–22 productive hours per day.
  • Hot break line, evaporation to 28–30 °Brix, aseptic filling in 220 L bag-in-drum or 1 000 L IBC.
  • Yield 5.5–6.5 t of fresh tomato per tonne of 30 °Brix paste, depending on inbound °Brix.
  • CAPEX is turnkey scope: process equipment, automation, installation, commissioning and training; civil works and land excluded.
  • EBITDA and payback assume export bulk paste pricing and no financing cost inside the operating margin.

From range to committed scenario

Indicative engineering ranges used by MCF Technology for budget screening. Final CAPEX, EBITDA and payback are fixed only in the feasibility study, once inbound °Brix, campaign length, utilities cost and target packaging are confirmed.

Related processes

A complete 120 t/h tomato processing plant project typically integrates pasteurization, sterilization, homogenization and aseptic filling. Follow the internal links below to deep-dive into each upstream and downstream stage engineered by MCF Technology.

Technical FAQ

Frequently asked questions

MVR or multiple-effect evaporation at 120 t/h?

MVR reduces steam demand drastically and is preferred where fuel is expensive and electricity is stable and affordable; forced-circulation multiple effect remains preferable where power supply is weak or electricity tariffs are high. The decision is an energy-cost calculation, made in the feasibility study.

How much fresh tomato is needed per campaign?

Roughly 220 000–290 000 t over 90–110 days, which is why raw-material contracting and field logistics — not equipment — are usually the limiting factor at this size.

How is water managed?

Flume, condensate and cooling water are recovered and reused; a 120 t/h plant with recovery typically consumes a fraction of the fresh water of an older non-recovery line, which also reduces effluent treatment cost.

Is redundancy needed on aseptic filling?

Yes. At this output an unplanned filler stop costs a full evaporation train, so filling heads are specified with redundancy and quick sterilisation cycles.

What CAPEX and payback apply?

Indicatively €14–19 million turnkey with 22–28% EBITDA and 3.5–5 year simple payback, subject to raw material cost, energy tariff and paste pricing.

What is the delivery schedule?

16–20 months contract-to-commissioning, with long-lead evaporation and filling equipment ordered first.

Next step

Request a feasibility study for your 120 t/h tomato processing plant