60 t/h tomato processing plant — the most financed campaign size

At 60 t/h a tomato plant produces enough bulk paste to sign export contracts, which is why this is the capacity most often submitted to banks and development funds. The configuration is a triple-effect evaporation train with two aseptic filling heads and full automation.

What MCF Technology supplies

  • Reception, washing, sorting: 60 t/h fresh tomato
  • Hot break and cold break option with dedicated extraction
  • Triple-effect falling-film evaporation with vapour recovery
  • Two aseptic filling heads for drums, IBC and bag-in-box
  • CIP / SIP, steam, cooling and compressed air utility block
  • SCADA with batch traceability and OEE reporting

Typical outputs

  • 30 °Brix and 36–38 °Brix tomato paste
  • Passata di pomodoro
  • Tomato juice (single strength)

Download — PDF

60 t/h tomato processing plant — technical datasheet

A real engineering datasheet, not a brochure: the same data published on this page, formatted for your technical and financial review.

  • Technical data & process

    Reference configuration, specifications, step-by-step process

  • Dimensions & layout

    Footprint, clear height, functional zones, utilities and manning

  • CAPEX & payback

    Indicative capacity / CAPEX / EBITDA / payback grid with assumptions

MCF Project Studio

From idea to commissioned plant, in one engineering path

Every commercial page on this site is connected to the same working method: process engineering, capacity sizing, CAPEX and a bankable financial plan over 3–10 years are produced together, not in sequence by different suppliers.

  1. 01 · Idea

    Is this factory feasible in my country, with my product and my formats?

    Start from the guided configurator
  2. 02 · Engineering

    Which capacity, process and utilities does my line actually need?

    Compare technologies and lines
  3. 03 · Investment

    What does it cost, what does it return, and is it bankable?

    Run the ROI simulator
  4. 04 · Purchase

    Who engineers, installs and services it worldwide?

    Request the technical-financial dossier

Capacity → CAPEX → payback

60 t/h tomato line — investment profile

The most frequently financed size: triple-effect evaporation, two aseptic filling heads and enough volume to support bulk export contracts.

Indicative capacity, CAPEX, annual output, EBITDA, payback and commissioning time
CapacityTurnkey CAPEXAnnual outputEBITDAPaybackCommissioning
60 t/h fresh tomato€8 – 11 million19 000 – 24 000 t/year of 30 °Brix paste20 – 26% of revenue4 – 5.5 years14 – 18 months contract-to-commissioning

Assumptions behind the figures

  • Campaign of 90–110 days per year, 20–22 productive hours per day.
  • Hot break line, evaporation to 28–30 °Brix, aseptic filling in 220 L bag-in-drum or 1 000 L IBC.
  • Yield 5.5–6.5 t of fresh tomato per tonne of 30 °Brix paste, depending on inbound °Brix.
  • CAPEX is turnkey scope: process equipment, automation, installation, commissioning and training; civil works and land excluded.
  • EBITDA and payback assume export bulk paste pricing and no financing cost inside the operating margin.

From range to committed scenario

Indicative engineering ranges used by MCF Technology for budget screening. Final CAPEX, EBITDA and payback are fixed only in the feasibility study, once inbound °Brix, campaign length, utilities cost and target packaging are confirmed.

Related processes

A complete 60 t/h tomato processing plant project typically integrates pasteurization, sterilization, homogenization and aseptic filling. Follow the internal links below to deep-dive into each upstream and downstream stage engineered by MCF Technology.

Technical FAQ

Frequently asked questions

Why is 60 t/h so common in financed projects?

It is the smallest capacity where specific CAPEX per tonne, export contract size and DSCR usually align: annual output of roughly 19 000–24 000 t of paste is enough for multi-buyer supply while the €8–11 million CAPEX remains inside typical project-finance envelopes.

Hot break or cold break at this size?

Most 60 t/h plants install hot break as the main route and keep a cold-break option for brighter-colour, lower-viscosity products such as pizza sauce bases. Both routes share reception and evaporation.

How much steam does the evaporation section use?

A triple-effect train uses roughly 0.35–0.40 kg of steam per kg of evaporated water; MVR can bring the thermal figure much lower in exchange for higher electrical demand and higher CAPEX.

What utilities are required?

Indicatively 16–22 t/h of steam, 1 800–2 600 m³/h of cooling water and 1 200–1 800 kW of installed electrical power, confirmed in the feasibility study.

What EBITDA and payback are realistic?

Indicatively 20–26% EBITDA on revenue with simple payback of 4–5.5 years at bulk export pricing. Both figures are planning ranges fixed only after the feasibility study.

How long to commission?

14–18 months contract-to-commissioning, with the campaign start date driving the whole schedule backwards.

Next step

Request a feasibility study for your 60 t/h tomato processing plant

MCF Technology delivers worldwide — engineering, installation, commissioning and after-sales service on every continent. Send us your throughput target and destination country and we will reply with a preliminary sizing and quote.