Impianti di lavorazione del pomodoro

Linee complete per passata, polpa, cubettato e concentrato: ricevimento e lavaggio, estrazione, evaporazione, sterilizzazione e riempimento asettico o in vaso.

EN focustomato processing planttomato paste processing lineaseptic filling machinefood processing equipment
Stabilimento chiavi in mano per la lavorazione industriale del pomodoro fresco

Impianto pomodoro: ricezione, frantumazione, hot-break, concentrazione e riempimento asettico di passata, polpa e concentrato.

Tomato processing plant: reception, crushing, hot-break pasteurisation, evaporation and aseptic filling for paste, puree and juice.

Tomatenverarbeitungsanlage: Annahme, Zerkleinerung, Hot-Break, Eindampfung und aseptische Abfüllung für Mark, Passata und Saft.

Scheda tecnica ufficiale · PDF

Estratta dalla brochure ufficiale MCF Technology “Food & Beverage Technology”. Scheda dedicata su richiesta — riceverai la sezione della brochure aggiornata all'ultima release.

Prodotti finiti / contenitori

  • Passata
  • Concentrato
  • Succo

Accessori & schede tecniche · Documentazione IT

PDF trilingue (IT · EN · FR). Per accessori, ricambi e schede componenti dedicate, richiedi la documentazione IT estesa: risposta entro 24 h lavorative.

Worldwide — progettazione, fornitura, installazione on-site, avviamento, formazione operatori e assistenza post-vendita in tutti i cinque continenti.

Descrizione ufficiale della linea

IT · Italiano

Impianti completi per la trasformazione del pomodoro in passata, concentrato e succo.

EN · English

Turnkey tomato processing plant and tomato paste processing line: reception, crushing, pasteurization, evaporation and aseptic filling for puree, paste and juice.

FR · Français

Installations complètes pour la transformation de tomates en purée, concentré et jus.

Testi verbatim dalla brochure ufficiale MCF Technology “Food & Beverage Technology” — nessuna claim inventata in fase di progettazione.

Flusso operativo · 6 stazioni

Process-flow tecnico: Pomodoro fresco → concentrato, passata e polpa

Pomodoro fresco → concentrato, passata e polpa: macchine nominate stazione per stazione e valori di resa lungo tutta la linea, dalla materia prima al prodotto finito.

In ingresso
Pomodoro da industria, 10–120 t/h in ingresso
In uscita
Concentrato 28–30 °Brix, passata 7–9 °Brix, polpa a cubetti
Resa end-to-end
16–18 kg di concentrato 28/30 °Brix ogni 100 kg di pomodoro (5,0–5,5 °Brix in ingresso)
  1. Stazione 1 di 6: Ricevimento e lavaggio

    Macchine

    • Idro-scarico a canaletta
    • Vasca di lavaggio a immersione con agitazione ad aria
    • Rullo di sollevamento e doccia di risciacquo
    • Nastro di cernita ottica e manuale

    Valori indicativi

    Portata
    10–120 t/h
    Resa di cernita
    94–97 %

    Lo scarto di cernita (verdi, marciumi, corpi estranei) è la principale perdita di massa della linea.

  2. Stazione 2 di 6: Frantumazione e hot break

    Macchine

    • Frantumatore a coltelli (crusher)
    • Scambiatore tubolare hot break
    • Pompa a lobi di trasferimento

    Valori indicativi

    Temperatura
    85–95 °C (hot break)
    Tempo di sosta
    60–120 s

    L'hot break inattiva le pectinesterasi e fissa la viscosità del prodotto finito; il cold break a 65–70 °C si usa per passate più fluide.

  3. Stazione 3 di 6: Estrazione e raffinazione

    Macchine

    • Estrattore a passatrice con setaccio 1,0–1,2 mm
    • Raffinatore a doppio stadio 0,6–0,8 mm
    • Turbo-estrattore per polpa a cubetti

    Valori indicativi

    Resa succo
    94–96 %
    Scarto bucce e semi
    4–6 %
  4. Stazione 4 di 6: Concentrazione

    Macchine

    • Evaporatore a film cadente a 2–4 effetti sotto vuoto
    • Condensatore a superficie
    • Densimetro in linea con controllo automatico del °Brix

    Valori indicativi

    Da / a
    5,0 → 28–30 °Brix
    Acqua evaporata
    80–83 % della massa
    Consumo vapore
    0,25–0,35 kg/kg d'acqua
  5. Stazione 5 di 6: Sterilizzazione e riempimento asettico

    Macchine

    • Sterilizzatore tubolare a tre tubi concentrici
    • Riempitrice asettica per sacco in fusto o bag-in-box
    • Riempitrice per vasetto e bottiglia con pastorizzatore a tunnel

    Valori indicativi

    Trattamento
    95–105 °C, 2–4 min
    Formati
    sacco 220 kg, bag-in-box 3–20 kg, vaso e bottiglia
    Perdita di riempimento
    0,3–0,8 %
  6. Stazione 6 di 6: Fine linea

    Macchine

    • Etichettatrice
    • Incartonatrice
    • Palettizzatore
    • Avvolgitore pallet

    Valori indicativi

    Efficienza linea (OEE)
    85–92 %
    Campagna tipica
    45–90 giorni, 20–24 h/giorno

Valori di resa e portata indicativi, tipici della tecnologia impiegata: vengono confermati nel bilancio di massa dello studio di fattibilità sulla base della materia prima reale e del prodotto finito richiesto.

Simula il bilancio di massa (t/h → rese)

PDF con process-flow, macchine nominate, controlli qualità e avvertenze sui valori indicativi.

EN · Compare configurations

Tomato processing plant — paste, puree & juice line: choose the right configuration

Benchmark 3 tiers before requesting a quote

Tomato processing plant configurations — from seasonal cold-break units to full evaporation + aseptic filling lines for paste and puree.

Seasonal cold-break line

Compact

Capacity
10 – 30 t/h fresh tomato
Formats
Passata in glass, tins and bag-in-box 3 – 20 L
Automation level
Semi-automatic · operator-assisted · single-PLC control
Key equipment
Reception + crusher + cold-break + pasteuriser + filler
Lead time
5 – 7 months ex-works
Ideal for
Regional cooperatives and seasonal producers.
Request quote
Most requested

Hot-break paste & puree

Industrial

Capacity
30 – 80 t/h fresh tomato
Formats
Paste in aseptic drum 200 L, puree in glass and tins
Automation level
Fully automatic · Siemens/Rockwell PLC · SCADA supervision
Key equipment
Hot-break + evaporator + scraped-surface pasteuriser + aseptic filler
Lead time
7 – 10 months ex-works + on-site commissioning
Ideal for
Mid-range paste and puree producers.
Book engineering call

Aseptic paste export plant

Turnkey Plant

Capacity
80 – 200 t/h fresh tomato
Formats
Aseptic paste in 200 L drums and 1,000 L IBC bulk
Automation level
Full plant automation · SCADA + MES · OEE and traceability ready
Key equipment
Full plant: multi-effect evaporator, aseptic tanks, IBC & drum fillers, CIP, SCADA
Lead time
10 – 14 months turnkey delivery + startup
Ideal for
B2B paste exporters serving global CPG buyers.
Scope turnkey plant

Ranges reflect the MCF Technology brochure envelope. Final capacity, formats and automation are engineered on the buyer's product, utilities and site conditions.

Perimetro di responsabilità MCF

Un unico interlocutore dallo studio di fattibilità all'assistenza post-vendita. La linea linee di lavorazione pomodoro è consegnata chiavi in mano con questo scope.

  • Studio di fattibilità, bilancio di massa, layout preliminare
  • Ingegneria di processo e selezione dei costruttori europei
  • Fornitura macchine e integrazione di linea
  • Installazione on-site, avviamento, collaudo
  • Formazione operatori del cliente
  • Assistenza post-vendita e ricambi originali worldwide
  • Certificazioni caso per caso (CE, EAC, USDA, UL)
  • Dossier finanziario bancabile 3–10 anni (DSCR, break-even)

Dettagli tecnici

Linee di lavorazione pomodoro: dati tecnici indicativi e immagini di impianto

Intervalli tipici di configurazione, non prestazioni contrattuali: capacità, formati, materiali a contatto e utilities vengono fissati in offerta dopo il dimensionamento e le prove di resa sul prodotto reale. Prezzo su richiesta.

Dati tecnici

Capacità indicativa
10 – 120 t/h di pomodoro fresco in ingresso
Prodotti finiti
Concentrato 28–30 e 36–38 °Bx, polpa, passata, cubettato
Concentrazione
Evaporatore multiplo effetto sotto vuoto con recupero termico
Confezionamento
Asettico bag-in-drum/bins, banda stagnata, vetro, brik
Conformità
Marcatura CE di insieme, direttiva macchine, documentazione multilingua

Moduli e macchine incluse

  • Ricevimento, lavaggio, cernita ottica e selezione
  • Hot/cold break, raffinazione e serbatoi tampone
  • Evaporatore e sterilizzatore tubolare
  • Riempimento asettico o riempitrici per contenitori retail
Cerca un altro prodotto nel catalogo
Linea di trasformazione del pomodoro con serbatoi in acciaio inox e nastro di alimentazione
Ricevimento, lavaggio e preparazione prima del trattamento termico.
Evaporatore multiplo effetto per concentrato di pomodoro con tubazioni di processo
Concentrazione sotto vuoto con recupero termico tra gli effetti.

Installazione e gestione

Come si installa e si gestisce la linee di lavorazione pomodoro: procedura passo passo

Sequenza operativa che MCF Technology segue per installare, collaudare e avviare la linee di lavorazione pomodoro, fino alla gestione quotidiana e alla manutenzione programmata. Consegna, montaggio e assistenza on-site sono inclusi in tutto il mondo.

Durata indicativa complessiva: circa 41 giorni lavorativi on-site.

  1. 1. Rilievo del sito e verifica delle utilities

    ~2 giorni

    Sopralluogo tecnico sul layout della linee di lavorazione pomodoro: quote di passaggio, pavimentazione e scarichi, spazi di manutenzione e disponibilità di vapore di processo, acqua di raffreddamento a circuito e scarico per acque di lavaggio. Si consegna la lista definitiva dei predisposizioni a carico del cliente.

  2. 2. Spedizione, ricezione e posizionamento dei moduli

    ~3 giorni

    Consegna worldwide con imballo per trasporto marittimo o su gomma, scarico e posizionamento dei moduli (Ricevimento, lavaggio, cernita ottica e selezione, Hot/cold break, raffinazione e serbatoi tampone, Evaporatore e sterilizzatore tubolare) sulle piazzole previste dal layout, con controllo del packing list e dello stato dei componenti.

  3. 3. Montaggio meccanico e tubistica

    ~20 giorni

    Assemblaggio dei gruppi, allineamento dei trasporti, saldature igieniche della tubistica in acciaio inox e installazione di valvole e strumenti secondo P&ID, con supervisione dei tecnici MCF Technology on-site.

  4. 4. Allacciamenti utilities e collegamenti elettrici

    ~4 giorni

    Collegamento di vapore di processo, acqua di raffreddamento a circuito e scarico per acque di lavaggio, cablaggio del quadro elettrico e del PLC, messa a terra, configurazione dell'HMI e delle ricette di processo per i formati previsti (Passata, Concentrato, Succo).

  5. 5. Sanificazione, CIP e prove a vuoto

    ~3 giorni

    Lavaggio e passivazione delle superfici a contatto, verifica dei circuiti CIP con controllo di portata, temperatura e concentrazione detergente, prove di tenuta e cicli a vuoto di tutti i moduli.

  6. 6. Collaudo funzionale e prove di processo

    ~4 giorni

    prova a caldo di evaporatore e sterilizzatore, curva di concentrazione Brix e test di riempimento asettico sui fusti/contenitori previsti. Le prove si eseguono con il prodotto reale del cliente e vengono registrate nel rapporto di collaudo.

  7. 7. Avviamento produttivo e formazione del personale

    ~5 giorni

    Avviamento assistito con produzione in continuo, addestramento di conduttori e manutentori su HMI, cambio formato, sicurezza e sanificazione, consegna di manuali e schemi in lingua concordata.

  8. 8. Gestione ordinaria e manutenzione programmata

    continuativo

    Conduzione quotidiana con controllo Brix e pH del concentrato, temperature di sterilizzazione e integrità delle sacche asettiche. Manutenzione programmata: pulizia fasci tubieri e piastre, verifica valvole asettiche e taratura rifrattometri in linea. Assistenza on-site e remota con ricambi critici concordati in offerta.

    • Controlli di processo quotidiani: controllo Brix e pH del concentrato, temperature di sterilizzazione e integrità delle sacche asettiche.
    • Manutenzione programmata: pulizia fasci tubieri e piastre, verifica valvole asettiche e taratura rifrattometri in linea.
    • Registrazione dei parametri e tracciabilità dei lotti tramite HMI/PLC.
    • Sanificazione CIP a fine turno secondo le procedure consegnate in avviamento.
    • Assistenza tecnica on-site e remota con gestione dei ricambi critici.

Predisposizioni a carico del cliente

  • vapore di processo, acqua di raffreddamento a circuito e scarico per acque di lavaggio
  • Pavimentazione industriale con scarichi e quote di passaggio conformi al layout
  • Prodotto reale per le prove di resa e il collaudo
  • Personale di produzione e manutenzione da formare durante l'avviamento

Moduli coinvolti nel montaggio

  • Ricevimento, lavaggio, cernita ottica e selezione
  • Hot/cold break, raffinazione e serbatoi tampone
  • Evaporatore e sterilizzatore tubolare
  • Riempimento asettico o riempitrici per contenitori retail

Tempi e attività sono indicativi: il piano di montaggio, collaudo e formazione viene definito in offerta dopo il rilievo del sito e il dimensionamento della linea. Nessun valore è una prestazione contrattuale.

Installation & operation

How to install and operate the tomato processing plant — paste, puree & juice line: step-by-step procedure

The operating sequence MCF Technology follows to install, commission and start up the tomato processing plant — paste, puree & juice line, through to daily operation and planned maintenance. Delivery, erection and on-site service are included worldwide.

Indicative total duration: about 41 working days on site.

  1. 1. Site survey and utilities check

    ~2 days

    Technical survey on the layout of the tomato processing plant — paste, puree & juice line: passage heights, flooring and drains, maintenance clearances and availability of process steam, closed-circuit cooling water and a drain for washing water. The final list of customer-side preparations is handed over.

  2. 2. Shipment, receiving and positioning of the modules

    ~3 days

    Worldwide delivery with sea-freight or road packing, unloading and positioning of the modules (Ricevimento, lavaggio, cernita ottica e selezione, Hot/cold break, raffinazione e serbatoi tampone, Evaporatore e sterilizzatore tubolare) on the areas foreseen by the layout, checking the packing list and the condition of the components.

  3. 3. Mechanical assembly and piping

    ~20 days

    Assembly of the units, conveyor alignment, hygienic welding of the stainless-steel piping and installation of valves and instruments according to the P&ID, supervised on site by MCF Technology technicians.

  4. 4. Utility hook-ups and electrical connections

    ~4 days

    Connection of process steam, closed-circuit cooling water and a drain for washing water, wiring of the electrical cabinet and PLC, earthing, HMI configuration and process recipes for the planned formats (Passata, Concentrato, Succo).

  5. 5. Sanitation, CIP and dry runs

    ~3 days

    Washing and passivation of the product-contact surfaces, CIP circuit verification with flow, temperature and detergent-concentration control, tightness tests and dry-run cycles on all modules.

  6. 6. Functional commissioning and process trials

    ~4 days

    hot run of evaporator and steriliser, Brix concentration curve and aseptic filling test on the planned drums/containers. Trials are run with the customer's real product and recorded in the commissioning report.

  7. 7. Production start-up and staff training

    ~5 days

    Assisted start-up with continuous production, training of operators and maintenance staff on HMI, format changeover, safety and sanitation, handover of manuals and drawings in the agreed language.

  8. 8. Daily operation and planned maintenance

    ongoing

    Daily operation with Brix and pH of the paste, sterilisation temperatures and aseptic bag integrity. Planned maintenance: cleaning of tube bundles and plates, aseptic valve checks and calibration of in-line refractometers. On-site and remote service with critical spare parts agreed in the quotation.

    • Daily process controls: Brix and pH of the paste, sterilisation temperatures and aseptic bag integrity.
    • Planned maintenance: cleaning of tube bundles and plates, aseptic valve checks and calibration of in-line refractometers.
    • Parameter recording and batch traceability through the HMI/PLC.
    • End-of-shift CIP sanitation following the procedures handed over at start-up.
    • On-site and remote technical service with critical spare-parts management.

Customer-side preparations

  • process steam, closed-circuit cooling water and a drain for washing water
  • Industrial flooring with drains and passage heights compliant with the layout
  • Real product for yield trials and commissioning
  • Production and maintenance staff to be trained during start-up

Modules involved in the erection

  • Ricevimento, lavaggio, cernita ottica e selezione
  • Hot/cold break, raffinazione e serbatoi tampone
  • Evaporatore e sterilizzatore tubolare
  • Riempimento asettico o riempitrici per contenitori retail

Durations and activities are indicative: the erection, commissioning and training plan is defined in the quotation after the site survey and line sizing. No figure is a contractual performance.

Mercati serviti

Linee di lavorazione pomodoro per Paese

Per ogni mercato una pagina dedicata con porti di sbarco, parametri di rete, documenti d'importazione e assistenza in loco.

Tutte le combinazioni impianto × mercato
Linea di trasformazione pomodoro fresco in concentrato e passata

Progetto realizzato · Referenza storica

Linee di lavorazione pomodoro · Passata, concentrato, succo

Realizzare impianti completi per la trasformazione del pomodoro in passata, concentrato e succo, come descritto nella brochure ufficiale MCF Technology.

  • Su specifica

    Capacità

  • Chiavi in mano

    Perimetro

  • 100% UE

    Origine macchine

Vedi il progetto realizzato: linee di lavorazione pomodoro · passata, concentrato, succo

Normative e standard di riferimento

Atti ufficiali UE e standard Codex Alimentarius applicabili al prodotto e all'impianto. Fuori dall'UE si applicano le norme del Paese di destinazione.

  • Codex CXS 57-1981 — Concentrati di pomodoro trasformatiFonte ufficiale
  • Dir. 2006/42/EC — Direttiva Macchine (marcatura CE)Fonte ufficiale
  • Reg. (EU) 2023/1230 — Regolamento Macchine, applicabile dal 20 gennaio 2027Fonte ufficiale
  • Reg. (EC) 852/2004 — Igiene dei prodotti alimentariFonte ufficiale
  • Codex CXC 1-1969 — Principi generali di igiene alimentare (HACCP)Fonte ufficiale
  • Reg. (EC) 1935/2004 — Materiali a contatto con gli alimentiFonte ufficiale
  • Reg. (EC) 2023/2006 — Buone pratiche di fabbricazione dei materiali a contattoFonte ufficiale

FAQ · Italiano

Domande frequenti — Linee di lavorazione pomodoro

Risposte tecniche per buyer e progettisti che valutano linee di lavorazione pomodoro — progettazione MCF Technology & SGE Italy, installazione in tutto il mondo.

Qual è la capacità tipica di un impianto pomodoro MCF?

In tre fasce esplicite — Compatta 10–30 t/h, Industriale 30–120 t/h, Alta capacità 120–200 t/h di pomodoro fresco al ricevimento — dimensionato sulla campagna di 90–110 giorni e sul target di Brix finale (28–30, 32–34 o 36–38° Brix).

Meglio hot break o cold break per una linea concentrato di pomodoro?

L'hot break (85–95 °C) preserva la viscosità ed è lo standard per il concentrato; il cold break (65–75 °C) dà colore più brillante e texture più morbida per sughi pizza e passata.

Quale evaporatore fornisce MCF per il concentrato?

Falling-film a doppio o triplo effetto fino a circa 80 t/h; a circolazione forzata triplo o quadruplo effetto oltre; ricompressione meccanica del vapore (MVR) quando il costo energetico giustifica il business case.

L'impianto pomodoro include la riempitrice asettica?

Sì. Riempitrici asettiche per bag-in-box 5–20 L, fusti 220 L e IBC 1.000 L, con tunnel di sterilizzazione, aria sterile in sovrappressione e cicli SIP integrati.

Quali certificazioni rispetta la linea pomodoro?

Marcatura CE (Direttiva Macchine UE), hygienic design EHEDG, superfici a contatto in AISI 304L / 316L. Documentazione orientata USDA e FDA fornita su richiesta per progetti destinati agli USA.

Dove installa MCF gli impianti pomodoro?

In tutto il mondo, con referenze significative in area mediterranea, Americhe, Africa sub-sahariana e Asia centrale. Installazione, avviamento e validazione HACCP eseguiti on-site dalle squadre MCF.

Qual è il lead time di una linea pomodoro pronta per la campagna?

12–14 mesi dal purchase order alla campagna estiva successiva per linee da 60–120 t/h chiavi in mano. Ordini firmati entro settembre entrano nella campagna dell'anno seguente; oltre quella data la finestra scivola di 12 mesi. FAT in Italia con acqua e pomodoro pilota prima della spedizione.

Che service è previsto durante la campagna di 90 giorni?

MCF garantisce squadra di service on-site in stand-by per tutta la campagna (90–110 giorni), kit ricambi ad alta rotazione già in stabilimento (ugelli finisher, cinghie di trasporto, membrane pompe) e reperibilità 24/7 con diagnostica remota sul SCADA di linea.

Che ROI e piano di rientro tipico ha un impianto pomodoro concentrato?

Con 32° Brix aseptic bag-in-box a 220 L, il payback tipico è 3–5 anni su prezzi export FOB Med, con margine EBITDA 18–25% in base al costo materia prima locale. MCF fornisce il modello di simulazione ROI a 6 anni e supporta finanziamento SACE/CDP per progetti extra-EU.

Pagina FAQ dedicata — Linee di lavorazione pomodoro

FAQ · Deutsch

Häufig gestellte Fragen — Tomato processing plant — paste, puree & juice line

Technische Antworten für Einkäufer und Ingenieure zur tomato processing plant — paste, puree & juice line — Engineering MCF Technology & SGE Italy, Installation weltweit.

Welche Kapazität hat eine MCF Tomatenverarbeitungsanlage?

In drei klaren Klassen — Compact 10–30 t/h, Industrial 30–120 t/h, High Capacity 120–200 t/h Frischtomate am Empfang — dimensioniert auf eine Kampagne von 90–110 Tagen und den End-Brix (28–30, 32–34 oder 36–38° Brix).

Hot-Break oder Cold-Break für eine Tomatenmark-Linie?

Hot-Break (85–95 °C) erhält die Viskosität und ist Standard für konzentriertes Tomatenmark; Cold-Break (65–75 °C) liefert helleres Rot und weichere Textur für Pizza-Saucen und Passata.

Welchen Verdampfer liefert MCF für Tomatenkonzentrat?

Fallfilm-Doppel- oder Dreifach-Effekt bis ca. 80 t/h, Zwangs-Zirkulation Dreifach- oder Vierfach-Effekt darüber; mechanische Brüdenverdichtung (MVR), wenn die Energiekosten den Business Case treiben.

Enthält die Tomatenanlage die aseptische Abfüllmaschine?

Ja. Aseptische Füller für Bag-in-Box 5–20 L, Fässer 220 L und IBCs 1.000 L, mit Sterilisationstunnel, Sterilluft-Overlay und integrierten SIP-Zyklen.

Welche Zertifizierungen erfüllt die Tomatenlinie?

CE-Kennzeichnung (EU-Maschinenrichtlinie), hygienisches EHEDG-Design, produktberührende Oberflächen in AISI 304L / 316L. USDA- und FDA-Dokumentation auf Anfrage für US-Projekte.

Wo installiert MCF Tomatenverarbeitungsanlagen?

Weltweit, mit Referenzen im Mittelmeerraum, Amerika, Subsahara-Afrika und Zentralasien. Installation, Inbetriebnahme und HACCP-Validierung erfolgen vor Ort durch MCF-Teams.

Welche Lieferzeit gilt für eine kampagnenbereite Tomatenverarbeitungsanlage?

12–14 Monate ab Bestellung bis zur nächsten Sommerkampagne für schlüsselfertige Linien mit 60–120 t/h. Bis September unterschriebene Verträge kommen in die Kampagne des Folgejahres; danach verschiebt sich das Fenster um 12 Monate. FAT in Italien mit Wasser und Pilot-Tomate vor Versand.

Welche Service-Abdeckung gilt während der 90-Tage-Tomatenkampagne?

MCF hält für die volle Kampagne (90–110 Tage) eine Service-Crew vor Ort in Bereitschaft, hoch-rotierende Ersatzteile bereits im Werk (Finisher-Düsen, Förderbänder, Pumpenmembranen) und 24/7-Rufbereitschaft mit Ferndiagnose am Linien-SCADA.

Welchen ROI und Payback hat eine Tomatenmark-Anlage typischerweise?

Bei 32° Brix aseptic Bag-in-Box 220 L liegt der Payback typisch bei 3–5 Jahren zu FOB-Med-Exportpreisen, mit 18–25 % EBITDA-Marge je nach lokalen Rohstoffkosten. MCF liefert das 6-Jahres-ROI-Modell und unterstützt SACE/CDP-Finanzierung für Projekte außerhalb der EU.

FAQ · English

Frequently asked questions — Tomato processing plant — paste, puree & juice line

Technical answers for buyers researching tomato processing plant — paste, puree & juice line — engineered by MCF Technology & SGE Italy, installed worldwide.

What is the typical capacity of an MCF tomato processing plant?

In three explicit tiers — Compact 10–30 t/h, Industrial 30–120 t/h, High Capacity 120–200 t/h of fresh tomato at reception — sized on the 90–110 day campaign and the final Brix target (28–30, 32–34 or 36–38° Brix).

Is hot break or cold break better for a tomato paste processing line?

Hot break (85–95 °C) preserves viscosity and is standard for concentrated tomato paste; cold break (65–75 °C) yields brighter colour and softer texture for pizza sauces and passata.

Which evaporator does MCF supply for tomato concentrate?

Falling-film double or triple effect up to about 80 t/h, forced-circulation triple or quadruple effect above that; mechanical vapour recompression (MVR) when the energy cost drives the business case.

Does the tomato processing plant include the aseptic filling machine?

Yes. Aseptic fillers for 5–20 L bag-in-box, 220 L drums and 1,000 L IBCs, with sterilization tunnel, sterile-air overlay and integrated SIP cycles.

What food processing equipment certifications does the tomato line meet?

CE marking (EU Machinery Directive), EHEDG hygienic design, AISI 304L / 316L contact surfaces. USDA and FDA-oriented documentation supplied on request for US-bound projects.

Where does MCF install tomato processing plants?

Worldwide, with major references in the Mediterranean basin, the Americas, sub-Saharan Africa and Central Asia. Installation, commissioning and HACCP validation are executed on-site by MCF crews.

Request · English

Get a quote or the technical datasheet — Tomato processing plant — paste, puree & juice line

Engineered by MCF Technology & SGE Italy. Delivery, installation and on-site service worldwide. Your work email is enough — an engineer replies personally within one business day.

Passo successivo

Chiedi un preventivo per linee di lavorazione pomodoro

Ricevi lo studio di fattibilità con capacità obiettivo, bilancio di massa, CAPEX indicativo e dossier finanziario bancabile. Consegna e installazione on-site in tutto il mondo.