Vai al contenuto principale

Linea di prodotto · Beverage e imbottigliamento

Linea di imbottigliamento birra in PET, vetro e lattina

Impianto completo per birrifici industriali e artigianali: processo, carbonatazione, riempimento isobarico, pastorizzazione e confezionamento multi-formato.

EN focusbeer bottling linebeverage filling linebrewery equipmentcanning line
Linea multi-formato per imbottigliamento birra in PET, vetro e lattina

Impianto per birrifici artigianali e industriali: carbonatazione, riempimento e confezionamento su formati PET, vetro e can.

Beer bottling line for craft and industrial breweries — carbonation, filling and packaging across PET, glass and can formats.

Bierabfüllanlage für Craft- und Industriebrauereien — Karbonisierung, Füllung und Verpackung in PET, Glas und Dose.

Scheda tecnica ufficiale · PDF

Estratta dalla brochure ufficiale MCF Technology “Food & Beverage Technology”. Scheda dedicata su richiesta — riceverai la sezione della brochure aggiornata all'ultima release.

Prodotti finiti / contenitori

  • PET
  • Vetro
  • Lattina

Accessori & schede tecniche · Documentazione IT

PDF trilingue (IT · EN · FR). Per accessori, ricambi e schede componenti dedicate, richiedi la documentazione IT estesa: risposta entro 24 h lavorative.

Worldwide — progettazione, fornitura, installazione on-site, avviamento, formazione operatori e assistenza post-vendita in tutti i cinque continenti.

Descrizione ufficiale della linea

IT · Italiano

Impianti completi per la preparazione, riempimento e confezionamento della birra in PET, vetro e lattina.

EN · English

Complete beer bottling line and beverage filling equipment for PET, glass and can — brewery process, carbonation, filling and end-of-line packaging.

FR · Français

Systèmes complets pour la préparation, le remplissage et l'emballage de bière en PET / verre / canette.

Testi verbatim dalla brochure ufficiale MCF Technology “Food & Beverage Technology” — nessuna claim inventata in fase di progettazione.

Flusso operativo · 5 stazioni

Process-flow tecnico: Birra finita → confezione

Birra finita → confezione: macchine nominate stazione per stazione e valori di resa lungo tutta la linea, dalla materia prima al prodotto finito.

In ingresso
Birra da tank di maturazione (bright beer tank)
In uscita
Bottiglia vetro, lattina, fusto keg
Resa end-to-end
97–99 % del volume di cantina confezionato
  1. Stazione 1 di 5: Chiarifica e carbonazione

    Macchine

    • Filtro a farina fossile o a cartucce
    • Carbonatore in linea
    • Tank di servizio isobarico

    Valori indicativi

    Perdite di filtrazione
    0,5–1,5 %
    CO₂ target
    4,5–5,5 g/l
  2. Stazione 2 di 5: Preparazione contenitore

    Macchine

    • Depallettizzatore lattine
    • Sciacquatrice rotativa
    • Lavabottiglie per vuoto a rendere

    Valori indicativi

    Portata
    2.000–24.000 bph
    Consumo acqua
    0,15–0,4 l/bottiglia
  3. Stazione 3 di 5: Riempimento isobarico

    Macchine

    • Riempitrice isobarica a contropressione
    • Tappatore corona / aggraffatrice per lattine
    • Sistema di pre-evacuazione e purge CO₂

    Valori indicativi

    Portata
    2.000–24.000 bph
    Ossigeno ripreso (TPO)
    < 80 ppb

    Doppia pre-evacuazione con lavaggio CO₂ per proteggere la shelf-life aromatica.

  4. Stazione 4 di 5: Pastorizzazione

    Macchine

    • Pastorizzatore a tunnel
    • Flash-pasteurizer a piastre per il circuito keg

    Valori indicativi

    Trattamento
    15–25 unità PU
    Perdite
    0,3–0,8 %
  5. Stazione 5 di 5: Etichettatura e fine linea

    Macchine

    • Etichettatrice adesiva o a colla a freddo
    • Confezionatrice in cartone wrap-around
    • Palettizzatore

    Valori indicativi

    Portata
    fino a 24.000 bph
    Efficienza linea (OEE)
    85–92 %

Valori di resa e portata indicativi, tipici della tecnologia impiegata: vengono confermati nel bilancio di massa dello studio di fattibilità sulla base della materia prima reale e del prodotto finito richiesto.

Simula il bilancio di massa (t/h → rese)

PDF con process-flow, macchine nominate, controlli qualità e avvertenze sui valori indicativi.

EN · Compare configurations

Beer bottling line — PET, glass & can filling: choose the right configuration

Benchmark 3 tiers before requesting a quote

Three beer bottling line tiers built around European fillers and craft-to-industrial packaging formats — PET, glass and can.

Craft & microbrewery

Compact

Capacity
1,500 – 4,000 bph
Formats
Glass bottle 0.33 – 0.75 L
Automation level
Semi-automatic · operator-assisted · single-PLC control
Key equipment
Isobaric filler-capper + semi-auto labeller
Lead time
5 – 7 months ex-works
Ideal for
Craft breweries and taprooms scaling to retail.
Request quote
Most requested

Regional multi-format brewery

Industrial

Capacity
4,000 – 20,000 bph
Formats
Glass, PET and can (330 – 500 mL)
Automation level
Fully automatic · Siemens/Rockwell PLC · SCADA supervision
Key equipment
Isobaric filler + seamer + tunnel pasteuriser + palletiser
Lead time
7 – 10 months ex-works + on-site commissioning
Ideal for
Regional breweries and contract packers.
Book engineering call

Industrial export brewery

Turnkey Plant

Capacity
20,000 – 60,000 bph
Formats
Full multi-format including keg and can-bottle lines
Automation level
Full plant automation · SCADA + MES · OEE and traceability ready
Key equipment
Full plant: brewhouse integration, CIP/SIP, SCADA, MES
Lead time
10 – 14 months turnkey delivery + startup
Ideal for
Industrial breweries and export-grade production.
Scope turnkey plant

Ranges reflect the MCF Technology brochure envelope. Final capacity, formats and automation are engineered on the buyer's product, utilities and site conditions.

Perimetro di responsabilità MCF

Un unico interlocutore dallo studio di fattibilità all'assistenza post-vendita. La linea linee di imbottigliamento birra è consegnata chiavi in mano con questo scope.

  • Studio di fattibilità, bilancio di massa, layout preliminare
  • Ingegneria di processo e selezione dei costruttori europei
  • Fornitura macchine e integrazione di linea
  • Installazione on-site, avviamento, collaudo
  • Formazione operatori del cliente
  • Assistenza post-vendita e ricambi originali worldwide
  • Certificazioni caso per caso (CE, EAC, USDA, UL)
  • Dossier finanziario bancabile 3–10 anni (DSCR, break-even)

Dettagli tecnici

Linee di imbottigliamento birra: dati tecnici indicativi e immagini di impianto

Intervalli tipici di configurazione, non prestazioni contrattuali: capacità, formati, materiali a contatto e utilities vengono fissati in offerta dopo il dimensionamento e le prove di resa sul prodotto reale. Prezzo su richiesta.

Dati tecnici

Capacità indicativa
1.000 – 12.000 contenitori/h secondo formato e schiuma
Formati
Vetro a rendere e a perdere, PET, lattina
Processo
Carbonatazione in linea, riempimento isobarico, pastorizzazione a tunnel o flash
Lavaggio
CIP automatico multi-circuito, ricette di sanificazione parametrizzate
Conformità
Marcatura CE di insieme, direttiva macchine, documentazione multilingua

Moduli e macchine incluse

  • Serbatoi di pressione e carbonatore in linea
  • Riempitrice isobarica con tappatore corona / capsulatore
  • Pastorizzatore a tunnel o flash pasteurizer
  • Etichettatrice, imballaggio in cartoni o cassette, palettizzazione
Cerca un altro prodotto nel catalogo
Riempitrice rotativa per bevande con bottiglie in vetro su nastro in acciaio inox
Blocco riempimento e tappatura in ambiente protetto.
Quadro di automazione di impianto alimentare con pannello HMI touchscreen e cabinet elettrici
Quadri di potenza, HMI di linea e supervisione dei parametri di processo.

Installazione e gestione

Come si installa e si gestisce la linee di imbottigliamento birra: procedura passo passo

Sequenza operativa che MCF Technology segue per installare, collaudare e avviare la linee di imbottigliamento birra, fino alla gestione quotidiana e alla manutenzione programmata. Consegna, montaggio e assistenza on-site sono inclusi in tutto il mondo.

Durata indicativa complessiva: circa 36 giorni lavorativi on-site.

  1. 1. Rilievo del sito e verifica delle utilities

    ~2 giorni

    Sopralluogo tecnico sul layout della linee di imbottigliamento birra: quote di passaggio, pavimentazione e scarichi, spazi di manutenzione e disponibilità di vapore o acqua calda per la sala cottura, acqua di raffreddamento e glicole per la cantina di fermentazione. Si consegna la lista definitiva dei predisposizioni a carico del cliente.

  2. 2. Spedizione, ricezione e posizionamento dei moduli

    ~3 giorni

    Consegna worldwide con imballo per trasporto marittimo o su gomma, scarico e posizionamento dei moduli (Serbatoi di pressione e carbonatore in linea, Riempitrice isobarica con tappatore corona / capsulatore, Pastorizzatore a tunnel o flash pasteurizer) sulle piazzole previste dal layout, con controllo del packing list e dello stato dei componenti.

  3. 3. Montaggio meccanico e tubistica

    ~15 giorni

    Assemblaggio dei gruppi, allineamento dei trasporti, saldature igieniche della tubistica in acciaio inox e installazione di valvole e strumenti secondo P&ID, con supervisione dei tecnici MCF Technology on-site.

  4. 4. Allacciamenti utilities e collegamenti elettrici

    ~4 giorni

    Collegamento di vapore o acqua calda per la sala cottura, acqua di raffreddamento e glicole per la cantina di fermentazione, cablaggio del quadro elettrico e del PLC, messa a terra, configurazione dell'HMI e delle ricette di processo per i formati previsti (PET, Vetro, Lattina).

  5. 5. Sanificazione, CIP e prove a vuoto

    ~3 giorni

    Lavaggio e passivazione delle superfici a contatto, verifica dei circuiti CIP con controllo di portata, temperatura e concentrazione detergente, prove di tenuta e cicli a vuoto di tutti i moduli.

  6. 6. Collaudo funzionale e prove di processo

    ~4 giorni

    prova a caldo della sala cottura, taratura delle rampe di temperatura, test di tenuta dei fermentatori e prova di riempimento isobarico. Le prove si eseguono con il prodotto reale del cliente e vengono registrate nel rapporto di collaudo.

  7. 7. Avviamento produttivo e formazione del personale

    ~5 giorni

    Avviamento assistito con produzione in continuo, addestramento di conduttori e manutentori su HMI, cambio formato, sicurezza e sanificazione, consegna di manuali e schemi in lingua concordata.

  8. 8. Gestione ordinaria e manutenzione programmata

    continuativo

    Conduzione quotidiana con controllo densità e temperatura di fermentazione, CO2 in riempimento, ossigeno disciolto in bottiglia. Manutenzione programmata: ispezione scambiatori, guarnizioni dei fermentatori e taratura sonde di temperatura e pressione. Assistenza on-site e remota con ricambi critici concordati in offerta.

    • Controlli di processo quotidiani: controllo densità e temperatura di fermentazione, CO2 in riempimento, ossigeno disciolto in bottiglia.
    • Manutenzione programmata: ispezione scambiatori, guarnizioni dei fermentatori e taratura sonde di temperatura e pressione.
    • Registrazione dei parametri e tracciabilità dei lotti tramite HMI/PLC.
    • Sanificazione CIP a fine turno secondo le procedure consegnate in avviamento.
    • Assistenza tecnica on-site e remota con gestione dei ricambi critici.

Predisposizioni a carico del cliente

  • vapore o acqua calda per la sala cottura, acqua di raffreddamento e glicole per la cantina di fermentazione
  • Pavimentazione industriale con scarichi e quote di passaggio conformi al layout
  • Prodotto reale per le prove di resa e il collaudo
  • Personale di produzione e manutenzione da formare durante l'avviamento

Moduli coinvolti nel montaggio

  • Serbatoi di pressione e carbonatore in linea
  • Riempitrice isobarica con tappatore corona / capsulatore
  • Pastorizzatore a tunnel o flash pasteurizer
  • Etichettatrice, imballaggio in cartoni o cassette, palettizzazione

Tempi e attività sono indicativi: il piano di montaggio, collaudo e formazione viene definito in offerta dopo il rilievo del sito e il dimensionamento della linea. Nessun valore è una prestazione contrattuale.

Installation & operation

How to install and operate the beer bottling line — pet, glass & can filling: step-by-step procedure

The operating sequence MCF Technology follows to install, commission and start up the beer bottling line — pet, glass & can filling, through to daily operation and planned maintenance. Delivery, erection and on-site service are included worldwide.

Indicative total duration: about 36 working days on site.

  1. 1. Site survey and utilities check

    ~2 days

    Technical survey on the layout of the beer bottling line — pet, glass & can filling: passage heights, flooring and drains, maintenance clearances and availability of steam or hot water for the brewhouse, cooling water and glycol for the fermentation cellar. The final list of customer-side preparations is handed over.

  2. 2. Shipment, receiving and positioning of the modules

    ~3 days

    Worldwide delivery with sea-freight or road packing, unloading and positioning of the modules (Serbatoi di pressione e carbonatore in linea, Riempitrice isobarica con tappatore corona / capsulatore, Pastorizzatore a tunnel o flash pasteurizer) on the areas foreseen by the layout, checking the packing list and the condition of the components.

  3. 3. Mechanical assembly and piping

    ~15 days

    Assembly of the units, conveyor alignment, hygienic welding of the stainless-steel piping and installation of valves and instruments according to the P&ID, supervised on site by MCF Technology technicians.

  4. 4. Utility hook-ups and electrical connections

    ~4 days

    Connection of steam or hot water for the brewhouse, cooling water and glycol for the fermentation cellar, wiring of the electrical cabinet and PLC, earthing, HMI configuration and process recipes for the planned formats (PET, Vetro, Lattina).

  5. 5. Sanitation, CIP and dry runs

    ~3 days

    Washing and passivation of the product-contact surfaces, CIP circuit verification with flow, temperature and detergent-concentration control, tightness tests and dry-run cycles on all modules.

  6. 6. Functional commissioning and process trials

    ~4 days

    hot run of the brewhouse, temperature-ramp calibration, fermenter tightness test and isobaric filling test. Trials are run with the customer's real product and recorded in the commissioning report.

  7. 7. Production start-up and staff training

    ~5 days

    Assisted start-up with continuous production, training of operators and maintenance staff on HMI, format changeover, safety and sanitation, handover of manuals and drawings in the agreed language.

  8. 8. Daily operation and planned maintenance

    ongoing

    Daily operation with fermentation gravity and temperature, CO2 at filling and dissolved oxygen in the bottle. Planned maintenance: heat-exchanger inspection, fermenter gaskets and calibration of temperature and pressure probes. On-site and remote service with critical spare parts agreed in the quotation.

    • Daily process controls: fermentation gravity and temperature, CO2 at filling and dissolved oxygen in the bottle.
    • Planned maintenance: heat-exchanger inspection, fermenter gaskets and calibration of temperature and pressure probes.
    • Parameter recording and batch traceability through the HMI/PLC.
    • End-of-shift CIP sanitation following the procedures handed over at start-up.
    • On-site and remote technical service with critical spare-parts management.

Customer-side preparations

  • steam or hot water for the brewhouse, cooling water and glycol for the fermentation cellar
  • Industrial flooring with drains and passage heights compliant with the layout
  • Real product for yield trials and commissioning
  • Production and maintenance staff to be trained during start-up

Modules involved in the erection

  • Serbatoi di pressione e carbonatore in linea
  • Riempitrice isobarica con tappatore corona / capsulatore
  • Pastorizzatore a tunnel o flash pasteurizer
  • Etichettatrice, imballaggio in cartoni o cassette, palettizzazione

Durations and activities are indicative: the erection, commissioning and training plan is defined in the quotation after the site survey and line sizing. No figure is a contractual performance.

Mercati serviti

Linee di imbottigliamento birra per Paese

Per ogni mercato una pagina dedicata con porti di sbarco, parametri di rete, documenti d'importazione e assistenza in loco.

Tutte le combinazioni impianto × mercato

Correlate · Beverage e imbottigliamento

Landing settore

Normative e standard di riferimento

Atti ufficiali UE e standard Codex Alimentarius applicabili al prodotto e all'impianto. Fuori dall'UE si applicano le norme del Paese di destinazione.

  • Dir. 2006/42/EC — Direttiva Macchine (marcatura CE)Fonte ufficiale
  • Reg. (EU) 2023/1230 — Regolamento Macchine, applicabile dal 20 gennaio 2027Fonte ufficiale
  • Reg. (EC) 852/2004 — Igiene dei prodotti alimentariFonte ufficiale
  • Codex CXC 1-1969 — Principi generali di igiene alimentare (HACCP)Fonte ufficiale
  • Reg. (EC) 1935/2004 — Materiali a contatto con gli alimentiFonte ufficiale
  • Reg. (EC) 2023/2006 — Buone pratiche di fabbricazione dei materiali a contattoFonte ufficiale

FAQ · Italiano

Domande frequenti — Linee di imbottigliamento birra

Risposte tecniche per buyer e progettisti che valutano linee di imbottigliamento birra — progettazione MCF Technology & SGE Italy, installazione in tutto il mondo.

La linea di imbottigliamento birra riempie PET, vetro e lattina nello stesso stabilimento?

La sezione di processo (sala cotta, carbonatazione, pastorizzatore) è condivisa; la linea di riempimento è modulare — MCF fornisce monoblocchi dedicati per vetro, PET e lattina alimentati dal medesimo tank di stoccaggio.

Quale velocità raggiunge una linea lattine MCF per birra?

Da 6.000 cph su impianti craft fino a 60.000 cph su linee industriali, con aggraffatrice, tunnel di pastorizzazione e shrink wrapper di fine linea.

Meglio pastorizzazione a tunnel o flash per la birra?

La pastorizzazione a tunnel (PU 15–25) è lo standard per birra in bottiglia e lattina a lunga shelf life; la flash pastorizzazione è impiegata a monte del riempimento PET e per birra in fusto. MCF dimensiona entrambe.

MCF integra la sala cotta con la linea di riempimento?

Sì — sala cotta, fermentatori, filtrazione, recupero CO₂ e linea di imbottigliamento sono progettate come un unico scope chiavi in mano con supervisione SCADA unificata.

Quale programma CIP viene usato sulla linea birra?

Una stazione CIP dedicata con fasi soda, acido e acqua calda, validata sui residui tipici della birra (proteine, resine di luppolo, lievito) e integrata con le valvole asettiche del riempitore.

Qual è il lead time di un birrificio chiavi in mano MCF?

10–14 mesi dal purchase order al primo brassaggio commerciale per birrifici 20–100 hl/cotta con linea di imbottigliamento integrata. Sudhaus e fermentatori arrivano in prefabbricato con FAT in Italia; l'imbottigliamento è collaudato con acqua sterile.

Che service e ricambi copre MCF sulla linea birra?

Kit ricambi critici per aggraffatrice, tappatrice e pastore a tunnel, contratto di manutenzione preventiva stagionale, teleassistenza sul PLC di linea e SLA 72 h on-site in tutto il mondo. Formazione mastro birraio e operatori inclusa nella messa in servizio.

Che ROI ha un birrificio da 5.000 hl/anno con linea lattine?

Con lattina 33 cl a 12.000 cph e mix craft premium, il payback tipico è 5–7 anni con EBITDA 15–25% in base a costo malto e strategia distributiva. MCF fornisce il simulatore ROI a 6 anni con leva finanziaria 4.0 e credito d'imposta.

Pagina FAQ dedicata — Linee di imbottigliamento birra

FAQ · Deutsch

Häufig gestellte Fragen — Beer bottling line — PET, glass & can filling

Technische Antworten für Einkäufer und Ingenieure zur beer bottling line — pet, glass & can filling — Engineering MCF Technology & SGE Italy, Installation weltweit.

Kann die Bier-Abfüllanlage PET, Glas und Dose an einem Standort abfüllen?

Der Prozessbereich (Sudhaus, Karbonisierung, Pasteur) ist geteilt; die Abfüllanlage ist modular — MCF liefert dedizierte Fülleraggregate für Glas, PET und Dose, gespeist aus demselben Puffertank.

Welche Geschwindigkeit erreicht eine MCF-Dosenlinie für Bier?

Von 6.000 cph auf Craft-Brauanlagen bis 60.000 cph auf industriellen Dosenlinien, mit Verschließer, Tunnelpasteur und Shrink-Wrapper am Linien-Ende.

Tunnel- oder Flash-Pasteurisierung für Bier?

Tunnelpasteurisierung (PU 15–25) ist Standard für Flaschen- und Dosenbier mit langer Haltbarkeit; Flash-Pasteurisierung wird vor der PET-Abfüllung und für Fassbier verwendet. MCF dimensioniert beides.

Integriert MCF Sudhaus und Abfüllanlage?

Ja — Sudhaus, Fermenter, Filtration, CO₂-Rückgewinnung und Bier-Abfüllanlage werden als schlüsselfertiger Umfang mit einheitlichem SCADA-System entwickelt.

Welches CIP-Programm läuft auf der Bierlinie?

Eine dedizierte CIP-Station mit Lauge-, Säure- und Heißwasserphasen, validiert für Bier-Verschmutzung (Proteine, Hopfenharze, Hefe) und integriert mit den aseptischen Ventilen des Füllers.

Welche Lieferzeit hat eine schlüsselfertige MCF-Brauerei?

10–14 Monate ab Bestellung bis zum ersten kommerziellen Sud für Brauereien 20–100 hl/Sud mit integrierter Abfüllanlage. Sudhaus und Gärtanks werden vorgefertigt mit FAT in Italien geliefert; die Abfüllanlage wird auf Sterilwasser in Betrieb genommen.

Welchen Service und welche Ersatzteile bietet MCF an der Bierlinie?

Kit kritischer Ersatzteile für Doppelfalzer, Verschließer und Tunnelpasteur, saisonaler präventiver Wartungsvertrag, Remote-Support an der Linien-SPS und 72-h-Vor-Ort-SLA weltweit. Braumeister- und Bedienerschulung ist in der Inbetriebnahme enthalten.

Welchen ROI liefert eine 5.000-hl-Jahres-Brauerei mit Dosenlinie?

Mit 33-cl-Dosen bei 12.000 cph und Craft-Premium-Mix liegt der Payback typisch bei 5–7 Jahren mit 15–25 % EBITDA je nach Malzkosten und Distributionsstrategie. MCF liefert den 6-Jahres-ROI-Simulator mit Industrie-4.0-Steuerhebel.

FAQ · English

Frequently asked questions — Beer bottling line — PET, glass & can filling

Technical answers for buyers researching beer bottling line — pet, glass & can filling — engineered by MCF Technology & SGE Italy, installed worldwide.

Can the beer bottling line fill PET, glass and can on the same site?

The process section (brewhouse, carbonation, pasteurizer) is shared; the beverage filling line is modular — MCF supplies dedicated filler monoblocks for glass, PET and can sharing the same buffer tank.

What speed can an MCF canning line for beer reach?

From 6,000 cph on craft brewery equipment up to 60,000 cph on industrial canning lines, with double-seamer, pasteurization tunnel and end-of-line shrink wrapper.

Is tunnel pasteurization or flash pasteurization preferred for beer?

Tunnel pasteurization (PU 15–25) is the standard for bottled and canned beer with long shelf life; flash pasteurization is used upstream of PET filling and for kegged beer. MCF sizes both.

Does MCF integrate the brewery equipment with the bottling line?

Yes — brewhouse, fermenters, filtration, CO₂ recovery and the beer bottling line are engineered as one turnkey scope with a single SCADA supervision system.

What CIP program is used on the beer filling line?

A dedicated CIP station with caustic, acid and hot-water phases, validated for beer soil (proteins, hop resins, yeast) and integrated with the filler's aseptic valves.

How is dissolved oxygen controlled on the beer bottling line?

In-line deaeration of the dilution water, CO₂ counter-pressure on the isobaric filler and pre-evacuation of the bottle headspace keep total package oxygen (TPO) below 80 ppb, protecting shelf life and flavour stability.

Request · English

Get a quote or the technical datasheet — Beer bottling line — PET, glass & can filling

Engineered by MCF Technology & SGE Italy. Delivery, installation and on-site service worldwide. Your work email is enough — an engineer replies personally within one business day.

Passo successivo

Chiedi un preventivo per linee di imbottigliamento birra

Ricevi lo studio di fattibilità con capacità obiettivo, bilancio di massa, CAPEX indicativo e dossier finanziario bancabile. Consegna e installazione on-site in tutto il mondo.