Vai al contenuto principale

Linea di prodotto · Beverage e imbottigliamento

Linea di imbottigliamento bibite gassate

Impianto per soft drink e bevande carbonate: preparazione sciroppo, premix, carbonatazione, riempimento isobarico e confezionamento multi-formato.

EN focussoft drink bottling linebeverage filling linebeverage processing equipmentcarbonated drink line
Linea di imbottigliamento bibite gassate con sala sciroppi e carbonatazione

Impianto per soft drink: preparazione sciroppi, carbonatazione, riempimento e fine linea per bevande gassate e ferme.

Soft drink bottling line: syrup preparation, carbonation, filling and end-of-line packaging for carbonated and still beverages.

Softdrink-Abfüllanlage: Sirupvorbereitung, Karbonisierung, Füllung und Endverpackung für kohlensäurehaltige und stille Getränke.

Scheda tecnica ufficiale · PDF

Estratta dalla brochure ufficiale MCF Technology “Food & Beverage Technology”. Scheda dedicata su richiesta — riceverai la sezione della brochure aggiornata all'ultima release.

Accessori & schede tecniche · Documentazione IT

PDF trilingue (IT · EN · FR). Per accessori, ricambi e schede componenti dedicate, richiedi la documentazione IT estesa: risposta entro 24 h lavorative.

Worldwide — progettazione, fornitura, installazione on-site, avviamento, formazione operatori e assistenza post-vendita in tutti i cinque continenti.

Descrizione ufficiale della linea

IT · Italiano

Impianti completi per l'imbottigliamento di bibite e soft drink.

EN · English

Turnkey soft drink bottling line and beverage filling equipment: syrup room, carbonation, filling and end-of-line packaging.

FR · Français

Systèmes complets pour l'embouteillage de boissons gazeuses.

Testi verbatim dalla brochure ufficiale MCF Technology “Food & Beverage Technology” — nessuna claim inventata in fase di progettazione.

Flusso operativo · 5 stazioni

Process-flow tecnico: Sciroppo e acqua → bibita carbonata

Sciroppo e acqua → bibita carbonata: macchine nominate stazione per stazione e valori di resa lungo tutta la linea, dalla materia prima al prodotto finito.

In ingresso
Acqua trattata, zuccheri, concentrati e CO₂
In uscita
PET, vetro, lattina
Resa end-to-end
98,5–99,5 % del volume preparato confezionato
  1. Stazione 1 di 5: Sala sciroppi

    Macchine

    • Dissolutore zuccheri con scambiatore
    • Filtro a carbone attivo
    • Tank di maturazione sciroppo agitato

    Valori indicativi

    Portata
    5–40 m³/h
    Precisione °Brix
    ± 0,05
  2. Stazione 2 di 5: Premix e carbonazione

    Macchine

    • Premix elettronico a misuratori massici
    • Deaeratore sotto vuoto
    • Carbonatore in linea con raffreddamento

    Valori indicativi

    CO₂
    3,5–8 g/l secondo ricetta
    Temperatura
    4–8 °C
  3. Stazione 3 di 5: Preparazione contenitore

    Macchine

    • Soffiatrice PET
    • Sciacquatrice rotativa
    • Depallettizzatore lattine

    Valori indicativi

    Portata
    3.000–36.000 bph
  4. Stazione 4 di 5: Riempimento isobarico

    Macchine

    • Riempitrice isobarica elettronica
    • Tappatore o aggraffatrice
    • Monoblocco blow-fill-cap

    Valori indicativi

    Portata
    3.000–36.000 bph
    Perdita CO₂
    < 0,2 g/l
  5. Stazione 5 di 5: Controllo e fine linea

    Macchine

    • Ispettore livello e tappo
    • Etichettatrice roll-fed
    • Fardellatrice
    • Palettizzatore robotizzato

    Valori indicativi

    Espulsi
    0,2–0,5 %
    Efficienza linea (OEE)
    86–93 %

Valori di resa e portata indicativi, tipici della tecnologia impiegata: vengono confermati nel bilancio di massa dello studio di fattibilità sulla base della materia prima reale e del prodotto finito richiesto.

Simula il bilancio di massa (t/h → rese)

PDF con process-flow, macchine nominate, controlli qualità e avvertenze sui valori indicativi.

EN · Compare configurations

Soft drink bottling line & beverage filling equipment: choose the right configuration

Benchmark 3 tiers before requesting a quote

Soft drink bottling lines and beverage filling equipment — syrup preparation, carbonation, filling and packaging for carbonated and still beverages.

Regional soft drink

Compact

Capacity
3,000 – 8,000 bph
Formats
PET 0.5 – 1.5 L, single format
Automation level
Semi-automatic · operator-assisted · single-PLC control
Key equipment
Syrup room + carbonator + isobaric filler + shrink-wrapper
Lead time
5 – 7 months ex-works
Ideal for
Regional soft-drink brands.
Request quote
Most requested

Multi-format CSD

Industrial

Capacity
8,000 – 24,000 bph
Formats
PET, glass and can (330 – 500 mL)
Automation level
Fully automatic · Siemens/Rockwell PLC · SCADA supervision
Key equipment
Automatic syrup room + integrated blower-filler + palletiser
Lead time
7 – 10 months ex-works + on-site commissioning
Ideal for
Branded producers and co-packers.
Book engineering call

Export CSD plant

Turnkey Plant

Capacity
24,000 – 60,000 bph
Formats
Full multi-format including hot-fill isotonic + energy drinks
Automation level
Full plant automation · SCADA + MES · OEE and traceability ready
Key equipment
Full plant: water treatment, syrup, filling, warehouse, MES
Lead time
10 – 14 months turnkey delivery + startup
Ideal for
Multinational beverage groups.
Scope turnkey plant

Ranges reflect the MCF Technology brochure envelope. Final capacity, formats and automation are engineered on the buyer's product, utilities and site conditions.

Perimetro di responsabilità MCF

Un unico interlocutore dallo studio di fattibilità all'assistenza post-vendita. La linea linee di imbottigliamento bibite è consegnata chiavi in mano con questo scope.

  • Studio di fattibilità, bilancio di massa, layout preliminare
  • Ingegneria di processo e selezione dei costruttori europei
  • Fornitura macchine e integrazione di linea
  • Installazione on-site, avviamento, collaudo
  • Formazione operatori del cliente
  • Assistenza post-vendita e ricambi originali worldwide
  • Certificazioni caso per caso (CE, EAC, USDA, UL)
  • Dossier finanziario bancabile 3–10 anni (DSCR, break-even)

Dettagli tecnici

Linee di imbottigliamento bibite: dati tecnici indicativi e immagini di impianto

Intervalli tipici di configurazione, non prestazioni contrattuali: capacità, formati, materiali a contatto e utilities vengono fissati in offerta dopo il dimensionamento e le prove di resa sul prodotto reale. Prezzo su richiesta.

Dati tecnici

Capacità indicativa
3.000 – 30.000 bottiglie/h
Prodotti finiti
Bibite gassate, tè freddo, energy drink, acque aromatizzate
Preparazione
Sciroppatura, premix con CO₂, riempimento isobarico
Formati
PET, vetro, lattina, formati famiglia e monodose
Automazione
PLC + HMI touch, ricette prodotto, storico allarmi, teleassistenza

Moduli e macchine incluse

  • Sala sciroppi con dosaggio zucchero e aromi
  • Carbonatore/premix e serbatoi di pressione
  • Blocco risciacquo–riempimento–tappatura isobarico
  • Etichettatura, fardellatrice, palettizzazione e avvolgitore
Cerca un altro prodotto nel catalogo
Riempitrice rotativa per bevande con bottiglie in vetro su nastro in acciaio inox
Blocco riempimento e tappatura in ambiente protetto.
Serbatoi di miscelazione in acciaio inox con agitatori e piattaforma di servizio
Preparazione ricetta: dosaggio ingredienti e miscelazione controllata.

Installazione e gestione

Come si installa e si gestisce la linee di imbottigliamento bibite: procedura passo passo

Sequenza operativa che MCF Technology segue per installare, collaudare e avviare la linee di imbottigliamento bibite, fino alla gestione quotidiana e alla manutenzione programmata. Consegna, montaggio e assistenza on-site sono inclusi in tutto il mondo.

Durata indicativa complessiva: circa 35 giorni lavorativi on-site.

  1. 1. Rilievo del sito e verifica delle utilities

    ~2 giorni

    Sopralluogo tecnico sul layout della linee di imbottigliamento bibite: quote di passaggio, pavimentazione e scarichi, spazi di manutenzione e disponibilità di CO2 alimentare, acqua trattata, acqua ghiacciata e aria compressa filtrata. Si consegna la lista definitiva dei predisposizioni a carico del cliente.

  2. 2. Spedizione, ricezione e posizionamento dei moduli

    ~3 giorni

    Consegna worldwide con imballo per trasporto marittimo o su gomma, scarico e posizionamento dei moduli (Sala sciroppi con dosaggio zucchero e aromi, Carbonatore/premix e serbatoi di pressione, Blocco risciacquo–riempimento–tappatura isobarico) sulle piazzole previste dal layout, con controllo del packing list e dello stato dei componenti.

  3. 3. Montaggio meccanico e tubistica

    ~14 giorni

    Assemblaggio dei gruppi, allineamento dei trasporti, saldature igieniche della tubistica in acciaio inox e installazione di valvole e strumenti secondo P&ID, con supervisione dei tecnici MCF Technology on-site.

  4. 4. Allacciamenti utilities e collegamenti elettrici

    ~4 giorni

    Collegamento di CO2 alimentare, acqua trattata, acqua ghiacciata e aria compressa filtrata, cablaggio del quadro elettrico e del PLC, messa a terra, configurazione dell'HMI e delle ricette di processo.

  5. 5. Sanificazione, CIP e prove a vuoto

    ~3 giorni

    Lavaggio e passivazione delle superfici a contatto, verifica dei circuiti CIP con controllo di portata, temperatura e concentrazione detergente, prove di tenuta e cicli a vuoto di tutti i moduli.

  6. 6. Collaudo funzionale e prove di processo

    ~4 giorni

    taratura del premix e del grado di carbonatazione, prova di riempimento isobarico e verifica tenuta tappi. Le prove si eseguono con il prodotto reale del cliente e vengono registrate nel rapporto di collaudo.

  7. 7. Avviamento produttivo e formazione del personale

    ~5 giorni

    Avviamento assistito con produzione in continuo, addestramento di conduttori e manutentori su HMI, cambio formato, sicurezza e sanificazione, consegna di manuali e schemi in lingua concordata.

  8. 8. Gestione ordinaria e manutenzione programmata

    continuativo

    Conduzione quotidiana con controllo Brix e volumi di CO2, livello di riempimento, coppia di chiusura e integrità bottiglia. Manutenzione programmata: verifica saturatore e carbonatore, guarnizioni delle valvole isobariche, taratura misuratori di portata. Assistenza on-site e remota con ricambi critici concordati in offerta.

    • Controlli di processo quotidiani: controllo Brix e volumi di CO2, livello di riempimento, coppia di chiusura e integrità bottiglia.
    • Manutenzione programmata: verifica saturatore e carbonatore, guarnizioni delle valvole isobariche, taratura misuratori di portata.
    • Registrazione dei parametri e tracciabilità dei lotti tramite HMI/PLC.
    • Sanificazione CIP a fine turno secondo le procedure consegnate in avviamento.
    • Assistenza tecnica on-site e remota con gestione dei ricambi critici.

Predisposizioni a carico del cliente

  • CO2 alimentare, acqua trattata, acqua ghiacciata e aria compressa filtrata
  • Pavimentazione industriale con scarichi e quote di passaggio conformi al layout
  • Prodotto reale per le prove di resa e il collaudo
  • Personale di produzione e manutenzione da formare durante l'avviamento

Moduli coinvolti nel montaggio

  • Sala sciroppi con dosaggio zucchero e aromi
  • Carbonatore/premix e serbatoi di pressione
  • Blocco risciacquo–riempimento–tappatura isobarico
  • Etichettatura, fardellatrice, palettizzazione e avvolgitore

Tempi e attività sono indicativi: il piano di montaggio, collaudo e formazione viene definito in offerta dopo il rilievo del sito e il dimensionamento della linea. Nessun valore è una prestazione contrattuale.

Installation & operation

How to install and operate the soft drink bottling line & beverage filling equipment: step-by-step procedure

The operating sequence MCF Technology follows to install, commission and start up the soft drink bottling line & beverage filling equipment, through to daily operation and planned maintenance. Delivery, erection and on-site service are included worldwide.

Indicative total duration: about 35 working days on site.

  1. 1. Site survey and utilities check

    ~2 days

    Technical survey on the layout of the soft drink bottling line & beverage filling equipment: passage heights, flooring and drains, maintenance clearances and availability of food-grade CO2, treated water, chilled water and filtered compressed air. The final list of customer-side preparations is handed over.

  2. 2. Shipment, receiving and positioning of the modules

    ~3 days

    Worldwide delivery with sea-freight or road packing, unloading and positioning of the modules (Sala sciroppi con dosaggio zucchero e aromi, Carbonatore/premix e serbatoi di pressione, Blocco risciacquo–riempimento–tappatura isobarico) on the areas foreseen by the layout, checking the packing list and the condition of the components.

  3. 3. Mechanical assembly and piping

    ~14 days

    Assembly of the units, conveyor alignment, hygienic welding of the stainless-steel piping and installation of valves and instruments according to the P&ID, supervised on site by MCF Technology technicians.

  4. 4. Utility hook-ups and electrical connections

    ~4 days

    Connection of food-grade CO2, treated water, chilled water and filtered compressed air, wiring of the electrical cabinet and PLC, earthing, HMI configuration and process recipes.

  5. 5. Sanitation, CIP and dry runs

    ~3 days

    Washing and passivation of the product-contact surfaces, CIP circuit verification with flow, temperature and detergent-concentration control, tightness tests and dry-run cycles on all modules.

  6. 6. Functional commissioning and process trials

    ~4 days

    premix and carbonation-level calibration, isobaric filling test and cap tightness check. Trials are run with the customer's real product and recorded in the commissioning report.

  7. 7. Production start-up and staff training

    ~5 days

    Assisted start-up with continuous production, training of operators and maintenance staff on HMI, format changeover, safety and sanitation, handover of manuals and drawings in the agreed language.

  8. 8. Daily operation and planned maintenance

    ongoing

    Daily operation with Brix and CO2 volumes, fill level, closure torque and bottle integrity. Planned maintenance: saturator and carbonator checks, isobaric valve gaskets and flow-meter calibration. On-site and remote service with critical spare parts agreed in the quotation.

    • Daily process controls: Brix and CO2 volumes, fill level, closure torque and bottle integrity.
    • Planned maintenance: saturator and carbonator checks, isobaric valve gaskets and flow-meter calibration.
    • Parameter recording and batch traceability through the HMI/PLC.
    • End-of-shift CIP sanitation following the procedures handed over at start-up.
    • On-site and remote technical service with critical spare-parts management.

Customer-side preparations

  • food-grade CO2, treated water, chilled water and filtered compressed air
  • Industrial flooring with drains and passage heights compliant with the layout
  • Real product for yield trials and commissioning
  • Production and maintenance staff to be trained during start-up

Modules involved in the erection

  • Sala sciroppi con dosaggio zucchero e aromi
  • Carbonatore/premix e serbatoi di pressione
  • Blocco risciacquo–riempimento–tappatura isobarico
  • Etichettatura, fardellatrice, palettizzazione e avvolgitore

Durations and activities are indicative: the erection, commissioning and training plan is defined in the quotation after the site survey and line sizing. No figure is a contractual performance.

Mercati serviti

Linee di imbottigliamento bibite per Paese

Per ogni mercato una pagina dedicata con porti di sbarco, parametri di rete, documenti d'importazione e assistenza in loco.

Tutte le combinazioni impianto × mercato

Correlate · Beverage e imbottigliamento

Landing settore

Normative e standard di riferimento

Atti ufficiali UE e standard Codex Alimentarius applicabili al prodotto e all'impianto. Fuori dall'UE si applicano le norme del Paese di destinazione.

  • Dir. 2006/42/EC — Direttiva Macchine (marcatura CE)Fonte ufficiale
  • Reg. (EU) 2023/1230 — Regolamento Macchine, applicabile dal 20 gennaio 2027Fonte ufficiale
  • Reg. (EC) 852/2004 — Igiene dei prodotti alimentariFonte ufficiale
  • Codex CXC 1-1969 — Principi generali di igiene alimentare (HACCP)Fonte ufficiale
  • Reg. (EC) 1935/2004 — Materiali a contatto con gli alimentiFonte ufficiale
  • Reg. (EC) 2023/2006 — Buone pratiche di fabbricazione dei materiali a contattoFonte ufficiale

FAQ · Italiano

Domande frequenti — Linee di imbottigliamento bibite

Risposte tecniche per buyer e progettisti che valutano linee di imbottigliamento bibite — progettazione MCF Technology & SGE Italy, installazione in tutto il mondo.

Acqua e bibite possono condividere la stessa linea di riempimento?

Sì — le linee PET soft drink sono spesso progettate con sala sciroppi commutabile e skid di carbonatazione, permettendo alla stessa linea di produrre acqua, CSD e succhi.

PET, vetro o lattina — quale scegliere per soft drink?

PET è il costo più basso per litro per bevande piatte o leggermente gassate. Vetro per premium e mixers; lattina per energy drink e CSD. MCF fornisce tutti e tre i formati.

Hot-fill o asettico per soft drink?

Hot-fill (85–92 °C) per tè, sport drink e alcuni succhi; asettico (< 30 °C) per bibite a bassa acidità e succhi premium. MCF dimensiona entrambe le configurazioni.

Qual è la velocità massima di una linea bibite MCF?

Fino a 36.000 bph su linee PET ad alta velocità per acqua e CSD, e 60.000 cph su linee lattina, con shrink wrapper e palettizzatore di fine linea.

La linea include sala sciroppi e skid di carbonatazione?

Sì. Dissoluzione zucchero, blending sciroppi, deaerazione e skid di carbonatazione sono integrati nello scope, a monte del monoblocco di riempimento.

Qual è il lead time per una linea soft drink CSD chiavi in mano?

9–12 mesi dal purchase order alla messa in servizio per linee PET 18.000–36.000 bph con syrup room e skid di carbonatazione integrati. FAT in Italia su acqua e formato pilota prima della spedizione.

Che service e ricambi copre MCF sulla linea bibite?

Contratto di service annuale, kit ricambi critici (valvole di riempimento CSD, sensori CO₂, cinghie palettizzatore), teleassistenza sul SCADA di linea e SLA 72 h on-site in tutto il mondo.

Che ROI ha una linea CSD 24.000 bph con marchio proprio?

Con mix cola-aranciata-tè freddo a marchio proprio, il payback tipico è 4–6 anni con EBITDA 12–18% in base al costo zucchero/HFCS e alla strategia distributiva. MCF fornisce il simulatore ROI a 6 anni.

Pagina FAQ dedicata — Linee di imbottigliamento bibite

FAQ · Deutsch

Häufig gestellte Fragen — Soft drink bottling line & beverage filling equipment

Technische Antworten für Einkäufer und Ingenieure zur soft drink bottling line & beverage filling equipment — Engineering MCF Technology & SGE Italy, Installation weltweit.

Können Wasser und Softdrinks dieselbe Abfüllanlage nutzen?

Ja — PET-Softdrink-Abfülllinien werden häufig mit umschaltbarem Syrup-Room und Karbonisierungs-Skid entworfen, so dass dieselbe Anlage Wasser-, CSD- und Saftkampagnen fährt.

PET, Glas oder Dose — welches Format für Softdrinks?

PET ist der niedrigste Preis pro Liter für stille und leicht karbonisierte Getränke. Glas ist Premium und Mixer; Dose wird für Energy Drinks und CSD gewählt. MCF liefert alle drei Formate.

Hot-Fill oder aseptisch für Softdrinks?

Hot-Fill (85–92 °C) für Tees, Sportgetränke und einige Säfte; aseptisch (< 30 °C) für säurearme Getränke und Premium-Säfte. MCF dimensioniert beide Konfigurationen.

Welche maximale Geschwindigkeit erreicht eine MCF-Getränkelinie?

Bis 36.000 bph auf Hochgeschwindigkeits-PET-Linien für Wasser und CSD, und 60.000 cph auf industriellen Dosenlinien, mit Shrink-Wrapper und Palettierer am Linien-Ende.

Enthält die Linie den Syrup-Room und Karbonisierungs-Skid?

Ja. Zuckerlösung, Sirup-Blending, Entgasung und Karbonisierungs-Skid sind im Umfang integriert, dem Füller-Monoblock vorgeschaltet.

Welche Lieferzeit hat eine schlüsselfertige CSD-Softdrink-Abfüllanlage?

9–12 Monate ab Bestellung bis zur Inbetriebnahme für PET-Linien 18.000–36.000 bph mit integriertem Syrup-Room und Karbonisierungs-Skid. FAT in Italien auf Wasser und Pilotformat vor Versand.

Welchen Service und welche Ersatzteile bietet MCF an der Softdrink-Linie?

Jährlicher Servicevertrag, Kit kritischer Ersatzteile (CSD-Füllventile, CO₂-Sensoren, Palettierer-Bänder), Remote-Support am Linien-SCADA und 72-h-Vor-Ort-SLA weltweit.

Welchen ROI liefert eine 24.000-bph-CSD-Linie für eine Eigenmarke?

Mit einem Cola-Orange-Eistee-Eigenmarken-Mix liegt der Payback typisch bei 4–6 Jahren mit 12–18 % EBITDA je nach Zucker-/HFCS-Kosten und Distributionsstrategie. MCF liefert den 6-Jahres-ROI-Simulator.

FAQ · English

Frequently asked questions — Soft drink bottling line & beverage filling equipment

Technical answers for buyers researching soft drink bottling line & beverage filling equipment — engineered by MCF Technology & SGE Italy, installed worldwide.

Can water and soft drinks share the same beverage filling line?

Yes — PET soft drink bottling lines are commonly designed with a switchable syrup room and carbonation skid, letting the same beverage filling equipment run water, CSD and juice runs.

PET, glass or can — which format is best for soft drinks?

PET is the lowest cost per litre for still and lightly carbonated drinks. Glass is preferred for premium and mixers; can is chosen for energy drinks and CSD. MCF supplies all three formats.

Is hot-fill or aseptic filling recommended for soft drinks?

Hot-fill (85–92 °C) for teas, sports drinks and some juices; aseptic (< 30 °C) for low-acid drinks and premium juices. MCF sizes both configurations for the soft drink bottling line.

What is the maximum speed of an MCF beverage filling line?

Up to 36,000 bph on high-speed PET water and CSD lines, and 60,000 cph on industrial can lines, with end-of-line shrink wrapper and palletizer.

Does the line include the syrup room and carbonation skid?

Yes. Sugar dissolution, syrup blending, deaeration and carbonation skid are integrated in the beverage processing equipment scope, upstream of the filler monobloc.

Is beverage deaeration necessary before carbonation?

Yes — a vacuum deaerator brings dissolved oxygen below 0.5 ppm before CO₂ injection, protecting flavour, colour and shelf life across CSD, hot-fill teas and vitamin-fortified sports drinks.

Request · English

Get a quote or the technical datasheet — Soft drink bottling line & beverage filling equipment

Engineered by MCF Technology & SGE Italy. Delivery, installation and on-site service worldwide. Your work email is enough — an engineer replies personally within one business day.

Passo successivo

Chiedi un preventivo per linee di imbottigliamento bibite

Ricevi lo studio di fattibilità con capacità obiettivo, bilancio di massa, CAPEX indicativo e dossier finanziario bancabile. Consegna e installazione on-site in tutto il mondo.