mid-capacity configuration for meat, by-products and broths: trays, pouches, sterilised cans. Figures below come from the same engine behind MCF Project Studio™, based on 3,200 production hours per year and a turnkey scope (process, sterilisation, packaging, palletising, utilities).

Reference figures

Indicative CAPEX
€3.75M – €5.00M
Annual output
20,672 t/year of finished product
EBITDA at full ramp-up
€5.46M (11%)
Estimated payback
0.8 years
Contract to commissioning
13 months

Indicative values computed with the MCF Project Studio™ engine: they are not a contractual offer. The final budget comes from the feasibility study with mass balance and site layout.

Turnkey scope

  • Mass balance, layout and machine specifications
  • Manufacturing in Italy with in-house FAT before shipment
  • Shipment, mechanical and electrical erection by MCF technicians
  • Full-load commissioning (SAT), operator and maintenance training
  • Recommended spares, remote support and on-site service worldwide

Contract to commissioning13 months

  1. Phase 1 · 1 months

    Studio di fattibilità e layout

    Bilancio di materia, layout preliminare, budget di CAPEX.

  2. Phase 2 · 1.5 months

    Progettazione esecutiva

    P&I, quadri elettrici, specifiche macchine e fornitori.

  3. Phase 3 · 6.5 months

    Costruzione e assemblaggio

    Produzione in officina, pre-assemblaggio e FAT prima della spedizione.

  4. Phase 4 · 2 months

    Spedizione e installazione

    Marcatura CE inclusa, trasporto su gomma.

  5. Phase 5 · 1.5 months

    Avviamento, SAT e formazione

    Collaudo a pieno carico, formazione operatori e manutentori, consegna documentazione.

Frequently asked questions

How much does a wet pet food production line rated 8 tph cost?

Indicative CAPEX for a turnkey 8 tph line ranges from €3.75M to €5.00M, including process, sterilisation, packaging, palletising and utilities. The exact figure depends on formats, contact materials and automation level, defined during the feasibility study.

What is the annual output of a 8 tph line?

With 3,200 production hours per year and 85% line efficiency, estimated output is 20,672 t/year of finished product. The figure already accounts for the process yield declared for meat, by-products and broths.

How long before the line is running?

From contract signature to full-load start-up it takes about 13 months: feasibility study and layout, detailed engineering, manufacturing with in-house FAT, shipment and erection, then SAT and operator training on site.

Is a 0.8 years payback realistic?

It is the ratio between mid CAPEX and EBITDA at full ramp-up, computed with a 11% sector margin. In Project Studio you can change selling price, annual hours and financing structure and immediately see how the return moves.

Go deeper: technical hubs and references

Paths matching this line: technical page, case studies from the same industry and reference hubs.

Need the exact figure for your site?

Open this configuration in Project Studio: change capacity, annual hours, country and financing structure and get the dossier with CAPEX, P&L and the 6-year plan.